91超碰碰碰碰久久久久久综合_超碰av人澡人澡人澡人澡人掠_国产黄大片在线观看画质优化_txt小说免费全本

溫馨提示×

溫馨提示×

您好,登錄后才能下訂單哦!

密碼登錄×
登錄注冊×
其他方式登錄
點擊 登錄注冊 即表示同意《億速云用戶服務條款》

Incorrect Cost for WIP Assembly Return 1

發布時間:2020-08-09 22:21:36 來源:ITPUB博客 閱讀:171 作者:chenshm329 欄目:大數據
Incorrect Cost for WIP Assembly Return 1

Incorrect Costs For Wip Assembly Return To Discrete Job Using Average Costing (文檔 ID 788680.1) Incorrect Cost for WIP Assembly Return 1

In this Document


Symptoms

Changes

Cause

Solution

References


Applies to:

Oracle Cost Management - Version 11.5.10.2 to 12.1.3 [Release 11.5 to 12.1]
Information in this document applies to any platform.

Symptoms


Find using the average cost method and our orgs are Project Manufacturing enabled. WIP Assembly returns to a job are supposed to be costs at the average unit value for completions from that job.
Material was issued to the job in the AUG-08 period at $2,774.81 and the job was fully completed (8 ea) at the same total cost in the same period.
In the following period (SEP-08), OSP resource costs of $1800 were received to the job. In an attempt to absorb this additional cost, all 8 were returned using the WIP Assembly return
transaction then all 8 were completed again using WIP Assy Completion transaction. Oracle costed the WIP assembly return at $0 cost.
This is incorrect. It should have returned 8 at $2,774.81 for a unit cost of $346.85. Then, the 2nd WIP assembly completion was costed at $4,574.81 ($2,774.81 + $1800) Essentially, the $2,774.81 material cost on the job was absorbed to inventory twice

EXPECTED BEHAVIOR
Expect ...8 returned at $2,774.81 for a unit cost of $346.85

-- Steps To Reproduce:
The issue can be reproduced at will with the following steps:
1. Open a standard discrete job in a manufacturing org using average cost method.
The routing should have an OSP resource requirement. the BOM should have one costed material component.
2. Issue material to the job and fully complete the job in one accounting period.
3. Close the accounting period
4. Receive OSP resource costs in the next period.
5. Do a WIP assembly return of all quantity completed. Then, do another final WIP assy completion

Changes

 

Cause

Code Issue

The material costs incurred against some operations (new operations) were not being relieved through the completion transactions

Solution

EBS 11.5.10.X

-- To implement the solution, please execute the following steps:


1. Download and review the readme and pre-requisites for Patch 7520866

bom  patch/115/sql  CSTLCACB.pls  115.6.115100.6 
bom  patch/115/sql  CSTLCASB.pls  115.3.115100.4 
bom  patch/115/sql  CSTPACCB.pls  115.17.115100.12 
bom  patch/115/sql  CSTPACSB.pls  115.8.115100.8


You can use the commands like the following:
strings -a $BOM_TOP/filename |grep '$Header'

5. Retest the issue.

6. Migrate the solution as appropriate to other environments.

---------------------------------------------------------------------


EBS 12.1.X

To implement the solution, please execute the following steps:


1) Please download and review the readme for Patch 11805897:R12.BOM.C


2) Please apply Patch 11805897:R12.BOM.C in a test environment.


3) Please confirm the following file versions:
CSTPACCB.pls 120.8.12010000.8
CSTPACSB.pls 120.2.12010000.4
CSTLCACB.pls 120.2.12010000.4
CSTLCASB.pls 120.1.12010000.3


4) Please retest the issue.


5) If the issue is resolved, please migrate the solution as appropriate to other environments.


向AI問一下細節

免責聲明:本站發布的內容(圖片、視頻和文字)以原創、轉載和分享為主,文章觀點不代表本網站立場,如果涉及侵權請聯系站長郵箱:is@yisu.com進行舉報,并提供相關證據,一經查實,將立刻刪除涉嫌侵權內容。

AI

南部县| 安远县| 当阳市| 黄大仙区| 美姑县| 佛坪县| 中方县| 乌兰察布市| 遂川县| 德惠市| 孟州市| 凤翔县| 新河县| 兴城市| 蕉岭县| 贵南县| 长治县| 甘南县| 灯塔市| 靖江市| 桦南县| 平阴县| 平顶山市| 利津县| 揭东县| 阳朔县| 尤溪县| 安新县| 英吉沙县| 那曲县| 南昌县| 涿州市| 海南省| 苏尼特左旗| 方山县| 石屏县| 宁河县| 宁远县| 香格里拉县| 新民市| 屏南县|